
Work has resumed at Scene Cafe, after abruptly stopping during the summer
The paper covering the windows was back up when I went by tonight, but for the last few weekends, there’s been work going on inside the building that’s eventually to become Scene Cafe (assuming the name hasn’t changed along with the opening date). A November 2010 opening was originally planned for the restaurant/lounge, but the construction workers disappeared mid-summer and the project languished, half-built, until a few weeks ago.
The project appears to have taken a turn into DIY territory, as the only cars to be seen on the lot while work is going on are regular vehicles, no commercial trucks or contractor’s vans. The crescent-shaped window upstairs still doesn’t have glass, but it’s been covered with plywood, and the exterior ground-level area is kept lit at night now. The construction debris container has been taken away, brought back and taken away again.
The brown paper that’s usually over the lower windows was down Saturday night and the downstairs interior was emanating a green glow. It was hard to tell from the outside whether the color was produced by light fixtures or something on the walls. A drink cooler and bakery case could be seen inside about a week ago.
The next time I pass by while people are working inside I’ll get an update on the new projected opening date and find out whether the concept and name will be the same.
Like this:
Like Loading...
Tags: "scene cafe", construction, downtown, piedmont